Auxiliary dielectric verification checks wiring insulation and separation, but modern LVCs contain electronics that cannot withstand a blanket high-voltage test. The procedure must define included circuits and justified exclusions.
Learning objectives
Classify circuits, select the applicable test and protect incompatible devices while preserving meaningful coverage.
Core engineering principles
Not every auxiliary circuit has the same insulation domain
Station DC, AC heaters, low-voltage electronics and communication ports require different treatment.
Electronics and suppression can limit the test
IEDs, power supplies, SPDs, RC networks and filters may need disconnection.
Exclusion must be documented
Removing a device does not excuse testing its field wiring; boundaries and alternative evidence should be recorded.
Temporary links can create hidden damage
Test jumpers must be controlled and removed with restoration checks.
Functional tests follow dielectric work
Connections and electronics are reconnected and verified after testing.
Engineering application method
- Step 1: Create a circuit inclusion/exclusion schedule.
- Step 2: Select voltage, duration and source from applicable requirements.
- Step 3: Disconnect incompatible devices with controlled tags.
- Step 4: Test wiring groups to earth and between circuits as required.
- Step 5: Restore and function-test all affected circuits.
Practical example
Applying a high AC voltage through a numerical relay input can destroy it. Isolating the IED while testing the terminal-to-field wiring preserves both safety and test coverage.
Common mistakes
- Testing the complete LVC indiscriminately.
- Excluding all wiring with electronics.
- Forgetting suppression devices.
- Leaving temporary earths or jumpers.
- Skipping post-restoration function checks.
Design and review checklist
- Which circuits are included?
- Why is each device excluded?
- Is wiring coverage preserved?
- Are test links controlled?
- Are functions retested afterward?
Instruments for insulation checks and circuit restoration
Choose the instrument after defining the test. An insulation-resistance reading and a dielectric-withstand result are different evidence. Neither instrument below replaces the prescribed dielectric-withstand test set. The assembly requirements and approved procedure determine the test voltage, duration, connections and acceptance criteria.
As an Amazon Associate I earn from qualifying purchases. The links below are paid affiliate links to Amazon.de product listings. Check the exact model, package, seller, current price and delivery terms there.

Fluke 1587 FC — when resistance testing is specified
If the approved procedure includes an insulation-resistance check on isolated auxiliary wiring, the 1587 FC combines that function with a multimeter. Its selectable DC insulation-test settings are 50, 100, 250, 500 and 1,000 V. That choice is useful across different permitted test duties; it is not permission to apply any setting to a connected relay or power supply.
Limit: it measures insulation resistance, not the prescribed AC dielectric withstand of an assembly. Isolate and discharge the circuit, protect incompatible electronics and follow the equipment instructions. Do not treat an insulation-resistance pass as completion of the FAT dielectric test.
Fluke specifications and manuals · Full profile and alternatives

Fluke 179 — tracing a fault after reconnection
After temporary links are removed and the wiring is restored, a conventional DMM helps investigate a missing auxiliary supply or an open connection. The 179 provides AC/DC voltage, resistance and continuity functions with a backlit display. That makes it a practical companion for restoration troubleshooting when insulation testing is handled by a separate instrument.
Limit: it has no insulation-resistance test source and cannot perform a dielectric-withstand test. Use resistance and continuity only on de-energised, discharged circuits; voltage checks must stay within the meter, lead and installation-category ratings. A continuity beep alone does not verify every restored interlock or trip function.
Fluke specifications and manuals · Full profile and alternatives
These are supporting instruments for low-voltage auxiliary work. They do not authorise measurements on MV/HV primary circuits or replace the required isolation, discharge and functional-test procedure.
When the job also includes a separate 5 kV insulation check
A project may include insulation-resistance work on isolated primary equipment as well as dielectric verification of its auxiliary circuits. Keep those test schedules separate. Do not apply 5 kV to the complete LVC, connected relays, power supplies or communication ports. The two testers below are for a separately approved DC insulation-resistance duty; neither supplies the prescribed AC dielectric-withstand test.
As an Amazon Associate I earn from qualifying purchases. The Amazon.de links below are paid affiliate links to exact-model searches. Check the model number, seller, calibration documentation, included high-voltage leads, warranty and delivery terms before ordering. Search results may include accessories or other models.

Fluke 1550C
Its 5 kV capability and labelled result memory suit a separate IR test schedule where readings must be associated with individual assets. The voltage must still be selected from the equipment instructions. The instrument is IP40, so plan a dry, protected work position.
Manufacturer specifications and manuals · Full selection guide and limitations
Exact-model search, not a verified product listing. Availability is unconfirmed.

Chauvin Arnoux CA 6545
Consider it when the approved diagnostic procedure needs DAR, PI or dielectric-discharge measurements in addition to a spot IR reading. Its 5,000 V setting is not a recommendation for auxiliary wiring. Confirm the CA 6545 recording facilities rather than assuming those of another model in the range.
Manufacturer specifications and manuals · Full selection guide and limitations
Exact-model search, not a verified product listing. Availability is unconfirmed.
Record the circuit boundary and discharge/earthing arrangements before testing. Afterwards, remove controlled temporary connections and complete the restoration and functional checks required by the project.
Standards basis and official sources
- IEC 62271-200:2021 + AMD1:2024 — AC metal-enclosed switchgear assemblies above 1 kV and up to 52 kV.
- IEC 61439-1:2020 — General rules for low-voltage switchgear and controlgear assemblies where applicable.
- IEC 60255-1:2022 — Common requirements for measuring relays and protection equipment.
Engineering note: Verify the contracted standard edition, amendments, manufacturer evidence and project-specific studies before applying these principles to a supplied assembly.