Engineering resources
Checklists, templates, diagrams, calculators, videos and practical guides.

Sensor-to-Trip Functional Assurance Matrix
A requirements-to-evidence matrix for CT/VT, IED logic, communications, DC trip circuits, interlocking and breaker operation.
View details
Pressure-Relief Interface Review Checklist
A coordination checklist for switchgear internal-arc pressure relief, room geometry, ducts, exits and installation-specific evidence.
View details
MV Switchgear Dew-Point and Heater Verification Worksheet
A field-ready worksheet for assessing condensation risk, heater sizing assumptions, thermostat/hygrostat control and verification evidence.
View details
Protection IED Cybersecurity FAT and SAT Checklist
A practical IEC 62351-aligned checklist for procurement, FAT, commissioning and handover of protection and control IEDs.
View details
Digital Protection End-to-End Commissioning Plan
A hold-point plan for proving the complete sensor-to-trip chain in conventional and IEC 61850 switchgear schemes.
View details
Protection Relay Test Set Specification Checklist
A procurement-neutral checklist for specifying conventional, low-energy analogue and IEC 61850 protection-test equipment.
View details