Protection Relay Test Set Specification Checklist

A procurement-neutral checklist for specifying conventional, low-energy analogue and IEC 61850 protection-test equipment.

Printable checklist availableDownload the formatted A4 checklist with status boxes, evidence fields, project details and approval record.

Download PDF checklist A4 PDF · 3 pages

This checklist converts a protection philosophy into test-equipment requirements. Complete it for the actual relay fleet and schemes; do not select a platform from headline channel counts.

1. Application inventory

  • List feeder, transformer, motor, bus, capacitor and interconnection schemes.
  • Record CT input type and nominal current: 1 A, 5 A, low-energy analogue or Sampled Values.
  • Record VT input type, nominal voltage, residual-voltage method and synchronising sources.
  • Identify differential, directional, distance, frequency, autoreclose and breaker-failure functions.

2. Analogue source requirements

  • State simultaneous current, voltage, VA burden, compliance voltage and phase-angle accuracy.
  • Define minimum stable output for sensitive earth-fault and metering tests.
  • Separate continuous output requirements from short-duration or paralleled-channel maxima.

3. Binary and timing requirements

  • Count independent wet/dry binary inputs and outputs.
  • Define threshold, debounce, timestamp resolution and permitted uncertainty.
  • Identify the exact start/stop event for every measured operating time.

4. Digital-substation scope

  • GOOSE publish/subscribe and dataset editing.
  • Sampled Values generation, quality simulation and scaling verification.
  • SCL import/export, VLAN priority, PRP/HSR and PTP requirements.
  • Packet capture and evidence retention without uncontrolled network bridges.

5. Evidence and lifecycle

  • Calibration traceability and uncertainty statement.
  • Controlled settings, test-plan and result revisions.
  • Offline operation, software licensing, update policy and exportable reports.
  • Field weight, lead system, connector safety, transport and environmental limits.

Acceptance evidence

Witness one maximum-burden test, one low-current accuracy test, one automated multi-element test and—where applicable—one project-SCL GOOSE/SV interoperability test. Record the exact hardware, firmware, software and licence configuration.